|
Description:
Installation of an Owner supplied tank at a new site, and construction of a new booster pump station to supply the tank and system, with radio telemetry from the tank to the booster station for control. The system included construction of new lines to a previously unserved area west of Southside. Significant rock was encountered during line construction. |