Description:
The project includes the
following elements: ballasted flocculation/sedimentation clarifier,
chemical feed system, clearwell storage, enclosing the existing
filters, backwash pond, plant control and telemetry system, 500,000
gallon elevated water storage tank, altitude valve, repainting
existing water storage tank, and demolishing the existing
flocculation sedimentation basin. Crist prepared a Facility
Plan for the work in accordance with the Drinking Water State
Revolving Fund program administered by the Arkansas Soil and Water
Conservation Commission and it received a Categorical Exclusion from
preparing an Environmental Information Document. Crist also
modeled the Murfreesboro water distribution system using H20Net. |